Page 19 - Danish Offshore Industry 2020
P. 19
DUC
in the North Sea Trym (Norway)
Non-DUC
Harald
A In production, 1997
Processing and
wellhead platform Lulita
(50 % DUC)
20 km (16" pipeline) In production, 1998
Valdemar
In production, 1993 AA B Gas pipeline to shore
Unmanned wellhead Svend Accomodation
platform platform (24" pipeline)
In production,
1996
BA AB
Unmanned Unmanned
wellhead wellhead platform Unmanned
platform wellhead platform 77 km (24" pipeline)
In production, 1984
4 km(8"pipeline) Tyra A Processing and
l e)
7km ( 2" p pe in 7 km (16" pipeline) 18 km (12" p pe in l e) Roar Bridge accommodation platform
i
i
module
In production, 1996
facilities
20 km (8" pipeline)
17 km (8" pipeline) 20 km (2" 65 km (16" pipeline) F with receiving Tyra East
11 km (16" pipeline) pipeline)
Tyra South East
Unmanned 11km (8" pipeline)
wellhead platform 11 km (2" pipeline) D A In production, 2002
A Processing and E Unmanned B
accommodation Riser platform Flare platform wellhead platform Processing and
platform 3 km (6" pipeline)
Tyra West D 3 km (14" pipeline) 11 km (8" pipeline) wellhead platform
Flare
platform B 11 km (16" pipeline)
Wellhead 11 km (8" pipeline)
platform 11 km (3,5 "pipeline)
E 3 km C
Bridge module (24" pipeline) Wellhead
B for gas processing platform
Wellhead and compression 3 km (24" pipeline)
platform 3 km (10" pipeline)
C Gas pipeline to shore
Wellhead 3 km (8” pipeline) km (14" pipeline) 215 km (30" pipeline)
platform
3 km (26” pipeline) 16 km (8" pipeline) 16
(1
Rolf 2"Hejre to Gorm (Ineos) 33 km (12" pipeline)
In production, 1986
Unmanned
wellhead Oil pipeline to shore Halfdan BC
platform Gorm 29 km (24" pipeline) 330 km (20’’ pipeline) Accomodation
In production, 2000
In production, 1981 13 BB platform
Wellhead
BA
97 km (26" pipeline) 17 km (8" pipeline) 17 km (3" pipeline) E Riser platform Wellhead platform
To F3 (The Netherlands)
C DC platform 7
Flare
Processing and platform
2 km ( 3’’ pipeline)
accommodation PLEM DB 2 km (24”pipeline) 7 km (3’’ pipeline)
Dagmar platform 17 km (14” pipeline) Accommodation 7 km (8’’ pipeline)
platform
2 km (6’’ pipeline)
In production, 1991 2 km (14’’ pipeline)
7 km (16’’ pipeline)
Unmanned 3 km (12’’ pipe.) Skjold 26 km (10" pipeline) 2 km (12’’ pipeline)
wellhead platform In production, 1982 BD CA
A 2 km (12’’ pipe.) PLEM DA Processing- Unmanned
platform
wellhead
Wellhead Processing and platform
platform D wellhead platform
B Flare platform 12 km (12" pipeline)
9 km
Wellhead C
9 km (8" pipeline)
F platform
(2" pipeline
) Accommodation B FA
platform Wellhead platform and 10 km (16" pipeline) Wellhead FE
F 11 km (6" pipeline) bridge module with platform Wellhead platform and bridge module
Wellhead, wellhead equipment FD with water injection equipment
processing and A Wellhead platform Flare platform
pump platform Dan
In production, 1972
11 km (12" pipeline)
FC
Processing and FB
Oil / condensate accommodation well- Out of service E
Gas 12 km (12" pipeline) platform head 0.5 km (4" pipeline) Unmanned
wellhead platform
Water FF platform
Multiphase FG B
Umbilical 9 km (12" pipeline) Processing Unmanned
Chemical 10 km (20" pipeline) platform Out of service Processing C
9 km (12" pipeline)
Out of sevice 13 km (6" pipeline) A platform Flare platform
FF FF Unmanned
Processing 13 km (2" pipeline) Wellhead
Kraka and wellhead platform D D
platform
In production, 1991 Unmanned
Dansk Undergrunds Consortium, DUC, is a joint venture between Total, 9 km (6" pipeline) Wellhead
Noreco and Nordsøfonden. Total is operator for all DUC’s activities. 9 km (10" pipeline) 3 km (16" pipeline) platform
Unmanned 3 km (8" pipeline)
3 km (12" pipeline)
In 1972, DUC commenced production from Denmark's first field development, Dan. wellhead platform Regnar
Subsequent development of Gorm, Skjold, Tyra and Rolf has made Denmark self Out of Service
In production, 1993
sufficient in oil and gas since 1991. Since then, Kraka, Dagmar, Regnar, Valdemar, Roar, Subsea completion
Svend, Harald, Lulita and Halfdan have been brought on stream and the production
further increased. In 2018, DUC had a production of 35 million barrels of oil and a sales
gas production of 3.3 billion m 3
DUC’s production facilities are connected by subsea pipelines, through which oil and
gas are transported to Gorm and Tyra. From here the processed oil and gas are sent to
shore.
Please visit www.dk.total.com for further information.
July 2019
17 / TYRA REDEVELOPMENT