Brownfield preparations offshore at the Tyra East field.
Photo: Total.
At the front is one of the new riser platforms and behind it
are two of the new wellhead platforms in the rebuilt Tyra
field. The original jackets are being re-used, but extended
by 13 metres. The tops of the platforms are being replaced
by new topsides. Animation: Total.