Page 14 - Danish Offshore Industry 2019
P. 14
DUC
in the North Sea Trym (Norway)
Non-DUC
Harald
A In production, 1997
Processing and
wellhead platform Lulita
(50 % DUC)
20 km (16" pipeline)
In production, 1998
Valdemar
In production, 1993 AA B
Unmanned wellhead Svend Accomodation Gas pipeline to shore
platform platform (24" pipeline)
In production,
1996
BA AB
Unmanned Unmanned
wellhead wellhead platform Unmanned
platform wellhead platform 77 km (24" pipeline)
4 km(8"pipeline) Tyra A Processing and
In production, 1984
l e)
7km ( 2" p pe in 7 km (16" pipeline) 18 km (12" p pe in l e) Bridge accommodation platform
i
i
module
Roar
F
with receiving
In production, 1996
facilities Tyra East
20 km (2"
65 km (16" pipeline)
20 km (8" pipeline)
17 km (8" pipeline)
11 km (16" pipeline) pipeline)
Tyra South East
Unmanned 11km (8" pipeline)
wellhead platform 11 km (2" pipeline) D A In production, 2002
A Processing and E Unmanned B
accommodation Riser platform Flare platform
platform 3 km (6" pipeline) wellhead platform Processing and
wellhead platform
Tyra West D 3 km (14" pipeline) 11 km (8" pipeline)
Flare
platform B 11 km (16" pipeline)
Wellhead 11 km (8" pipeline)
platform 11 km (3,5 "pipeline)
E 3 km C
Bridge module (24" pipeline) Wellhead
B for gas processing platform
Wellhead and compression 3 km (24" pipeline)
platform 3 km (10" pipeline)
C Gas pipeline to shore
Wellhead km (14" pipeline)
platform 215 km (30" pipeline)
(1 16 km (8" pipeline) 16
Rolf 2"Hejre to Gorm (Ineos) 33 km (12" pipeline)
In production, 1986
Unmanned Oil pipeline to shore
wellhead Halfdan BC
platform Gorm 29 km (24" pipeline) 330 km (20’’ pipeline) Accomodation
In production, 2000
In production, 1981 13 BB platform
Wellhead
97 km (26" pipeline) 17 km (8" pipeline) 17 km (3" pipeline) E Riser platform Wellhead platform
BA
To F3 (The Netherlands)
Flare
C DC platform 7
Processing and platform
accommodation PLEM DB 2 km (24”pipeline) 7 km (3’’ pipeline)
platform Accommodation 2 km ( 3’’ pipeline)
Dagmar 17 km (14” pipeline) platform 7 km (16’’ pipeline)
In production, 1991 7 km (8’’ pipeline)
2 km (6’’ pipeline)
Unmanned 3 km (12’’ pipe.) Skjold 26 km (10" pipeline) 2 km (14’’ pipeline)
wellhead platform In production, 1982 2 km (12’’ pipeline) BD CA
A 2 km (12’’ pipe.) PLEM Processing- Unmanned
wellhead
platform
Wellhead DA platform
Processing and
platform D wellhead platform
B Flare platform 12 km (12" pipeline)
9 km
Wellhead C
9 km (8" pipeline)
F platform
(2" pipeline
) Accommodation B Wellhead platform and FA FE
Wellhead
platform
F 11 km (6" pipeline) 10 km (16" pipeline)
bridge module with platform Wellhead platform and bridge module
Wellhead, A wellhead equipment FD with water injection equipment
processing and Wellhead platform Flare platform
pump platform Dan
In production, 1972
11 km (12" pipeline)
FC
Processing and FB
Oil / condensate accommodation well- Out of service E Unmanned
Gas platform head 0.5 km (4" pipeline) wellhead platform
Water 12 km (12" pipeline) FF platform
Multiphase FG B
Umbilical 9 km (12" pipeline) Processing Unmanned
Chemical 10 km (20" pipeline) platform Out of service Processing C
platform
Out of sevice 13 km (6" pipeline) A Flare platform
9 km (12" pipeline)
FF FF Unmanned
Processing 13 km (2" pipeline) Wellhead
Kraka and wellhead platform D D
platform
In production, 1991 Unmanned
Dansk Undergrunds Consortium, DUC, is a joint venture between Total, 9 km (6" pipeline) Wellhead
Shell, Chevron and Nordsøfonden. Total is operator for all DUC’s activities. 9 km (10" pipeline) 3 km (16" pipeline) platform
Unmanned 3 km (8" pipeline)
3 km (12" pipeline)
In 1972, DUC commenced production from Denmark's rst eld development, Dan. wellhead platform Regnar
.
Subsequent development of Gorm, Skjold, Tyra and Rolf has made Denmark self Out of Service
In production, 1993
sucient in oil and gas since 1991. Since then, Kraka, Dagmar, Regnar, Valdemar, Roar, Subsea completion
Svend, Harald, Lulita and Halfdan have been brought on stream and the production
further increased. In 2017, DUC had a production of 42 million barrels of oil and a sales
gas production of 4.9 billion m 3
DUC’s production facilities are connected by subsea pipelines, through which oil and
gas are transported to Gorm and Tyra. From here the processed oil and gas are sent to
shore.
Please visit www.dk.total.com for further information. 12 / XXXX XXXXX
September 2018